A feasibility study is envisioned to be conducted under the program of Support for Infrastructure Investment in Indonesia (“S4I”) which is funded by the European Union through Kreditanstalt für Wiederaufbau (“KfW”) and PT Sarana Multi Infrastruktur (Persero) (“PT SMI”) as the Project Executing Agency.
The feasibility study shall be specifically focused on the development of Grindulu Pumped Storage Hydropower Plant project.
The following measures shall be financed under the Project:
An electronic submission is applied. A complete set of bidding documents is available to interested Bidders after registration at the following website: https://www.exfitender.de/.
The extended submission date is 17th of June, 2024 at 2:00 pm, local time in Frankfurt am Main (Germany) / at 7:00 pm, Western Indonesia Time. Late Bids will be rejected. The new deadline for submission of clarifications is 3rd of June 2024.
For further information, please go to https://www.exfitender.de/ and log on (or create a user profile). The integrated search function of Exfitender will allow you to find the tender and to register your interest, access the PQ Document and additional materials (if applicable).
Should you require any technical assistance, please check Exfitender for user guides and help videos.
Any request for PQ clarification shall be sent through the electronic system Exfitender. After logging on and accessing the tender detail page, users will find the option “Submit Clarification Request”.
PT Sarana Multi Infrastruktur (Persero)
pengadaan@ptsmi.co.id
Request for Expression of Interest: Consultant Services for the Preparation of a Master Plan for the Housing Sector and Residential Areas of the New National Capital City (IKN) (PP3025)
Date | : | 06 February 2025 - 14 February 2025 |
Status | : | Close/Tutup |
Announcement of Results: Procurement of Office Renovation Work on 48th floor
Date | : | - |
Status | : | Announcement/Pengumuman |
Request for Expressions of Interest: GREM Transaction Advisory Support Consultant
Date | : | 08 September 2021 - 29 September 2021 |
Status | : | Close/Tutup |